Showing posts with label tv drama. Show all posts
Showing posts with label tv drama. Show all posts
05:35

CSI Miami opening sequence

Our group chose to do the CSI Miami sequence. We chose this because we thought most of the opening credits would be simple to do, as quite a lot of it is just characters faces. The sequence includes a series of characters head shots, some scene clips and quite a few special effects.
I think the parts which we will find the hardest to do are the special effects because they are quite complex to succeed with using just Lego. For example, there are parts of the sequence where you see them examining evidence with a pair of tweezers and also a dead body autopsy, on a tv screen. This will be very hard to make with Lego and to make it look more like the sequence we would have to use something other than Lego. Another hard part would be the effect going across the screen throughout the sequence. This consists of clear squares going across the screen in different ways and we could do this using some clear plastic but there is no way we could do this with Lego.
This sequence will be quite difficult in some places but I'm sure we can find some way succeeding with all the issues and it will be very fun to do.

11:20

The Link Between Holby Blue and A Very Peculiar Practice

One link between these two tv drama's could be that they both feature a police romance at least once but this was the only link i could find. 

12:33

Underground Task

We had a task to fill out a map of the underground trains with a variety of different TV drama's. Each drama could not be put down twice and where ever lines would cross, the drama would have to link with the line that ran through it. 

To begin with the task was quite difficult to sort out, we didn't know how we would start going about it and we neglected to plan anything which made it hard to know and organize things. After working it out, we assigned people to jobs, such as, we had four people on the laptops resourcing each category that we had a chosen to put on the map. We also had three people writing down all the drama's in each category, that the others had resourced and then two people would write on the big map and plan out where we put each drama which we came up with. 
We managed to complete less than a quarter of the map, assigned four lines to a category and we came across many situations where things would clash or we could match a drama with another category. It took us such a long time to get that far, with a lot of mistakes and I'm sure it will take us even long to finish it without any faults.